MedWetCoast Project for conservation of Wetlands and Coastal Ecosystems in the Mediterranean Region MedWetCoast Project for conservation of Wetlands and Coastal Ecosystems in the Mediterranean Region
Last Project News
Presentation
Project Components
Photos Gallery
Contact
  Saturday 10th of December 2016
Search    
   
Home
presentation
Last Projects News
International Info
Project component
Net expert
Archives
Find a job
Forum
Links
Newsletter
Contact
Publication
Project Documents
Sites Diagnosis report
Training Reports
Management Plan Reports
Regional Networking and Documenting
Partners
Fonds Français Pour l’Environnement Mondial [FFEM]
view all partners
Member access
Login




Egyptian quarterly report
Management plan progress of the Burullus protected area
Period from: January 2003 to March 2003
Wednesday 30 April 2003, by Web Team

Follow up the last development of the MedWetCoast Project in Egypt. This document presented in tabular form an owerview of expected results, indicators, results achieved on Burullus protected area and corrective measures must be done in light of problems faced during the developpement process of the Egyptian project. These measures should allow an improvement in the implementation of the management plan.



Expected results

Indicators Results achieved
Setting up the team responsible for the management plan Designation of the local teams, definition of their terms of reference and timetable Burullus Management Plan Team has completed the first draft for Burullus Management Plan. (Projects have yet to be developed in details)
Participative diagnosis with stakeholders and interested parties Local committees, private and public meetings, workshops, participative diagnosis surveys conducted with users, etc. Workshop for validation of first draft of management plan was scheduled for March 2003, but postponed by Governor of Kafr El Sheikh. Efforts are exerted to set a new date that is suitable for both the Minister of State for Environmental Affairs and the Governor.
Improvement of the database
Mapping, scientific, technical and administrative documents, etc. Legal and Institutional study, December 2002, by Dr. Sahar Hafez
Burullus Management Plan Document, By the Management Plan Team, December 2002.
Field activities, development of management and monitoring actions Actions undertaken in the field, management and monitoring activities, surveys, construction works, infrastructure, etc.
Surveillance activities: water quality, sedimentations & physical properties by the Institute of water analysis, Ministry of Irrigation. Training program for the Burullus staff on use of MedWet database to enter monitored data, and use as a monitoring tool. Construction of visitor’s center was completed. Dredging of Bughaz and canals, recommended by Hydrology expert, undertaken by Local Advisory Committee. Setting up of weirs on two drains to prevent water hyacinth from entering the lake, and to divert part of the drainage water to be used in newly reclaimed land, recommended by Hydrology expert (Management Plan Team), undertaken by Local Advisory Committee.
Training and network development actions Participation of local people in the project, in training, meetings and missions of national and international experts, etc. The national component organized a workshop (8/1/2003 in Qanater, Egypt) for the NGOs within the vicinities of Burullus. With the cooperation of the GEF small grant programme potential conservation efforts that could be done by these NGOs, to be funded by the GEF small grant programme, were presented. Based on these discussions concept papers for four proposed projects were submitted by four NGOs (technical support was provided by National component’s Community Development Experts) to the GEF small grants programme and approved. Project proposals will follow.